Important note

Wall pillar with wet hanging, 


wet paste construction and floor paving shop, in order to ensure the quality of the project, it is recommended to use the market quality of high-quality adhesive paving. 


Floor floor paving, 


the floor can not have water, for leveling the cement mortar for 1: 3 (volume ratio) dry hard cement mortar, mortar should be measured in strict accordance with the ratio, control the water-cement ratio, the construction process is strictly prohibited In the arbitrary water; the degree of dry hard to hand into the group is not loose but the floor that is scattered is appropriate. 


If the choice of white 


cement paving must be strictly tested its strength and quality, because the quality of white cement on the market uneven, and there are false white cement mixed among them. 


Outdoor stacking, 


the time should not be too long, the winter construction should be used to cover the quartzite rock quarry, quartz stone pavement 2 hours before moving into the room to melt. Rainy season construction should be covered with waterproof cloth to prevent rain. 


Quartz stone floor paving for the floor, 


the plate between the plate to be reserved for about 2mm in order to facilitate the evaporation of water in the cement mortar to offset the expansion of stress. Large area pavement, vertical and horizontal every 5m need to be installed 8mm expansion joints, to prevent the expansion of the surface and structure, shrinkage caused by stone bumps or rupture. 


Quartz stone floor paving 


and the use of side edge leveling shop construction process, the need for conservation 24 hours, 2 to 3 days can not master and stack items, 3 to 5 days before the seam.

Find Us On

Contact Us

11 floor Zhuo Yue Xi Hai An. office building A, Zhu Hai Road, Huangdao District, Qingdao City, Shandong Province
+86-532-88187616
info@qdkfstone.com
https://www.kefengquartzstone.com/
Copyright © Qingdao Kefeng New Materials Co.,Ltd All Rights Reserved.